I have a production BOM where I have the same component listed three times.
1. amount of "goop" that is needed to fill the containers for the finished good
2. amount of "extra goop" that is needed to prime the tooling
3. the same "extra goop" to…
Most of our routes are set up to track minutes, but when i tried to add a non-cost operation to my route where a product will wait for 7 days, the number format gave me an error. I don't want to have to switch the tracking from minutes to hours to have…
Is there a way to set up my production boms or routes in a way that indicates that a group of them is of a similar product and should be detail scheduled together to reduce set up time ?