• Preparation time PRPTIME not working on weekends

    I found a problem in X3, i don't know if it is related to PARAMETERS or bug... In our company we have preparation time setted in all operations representing the "Transportation time" in each operation. Normally we have 2 days in preparation time and…
  • What is the purpose of the following: Substitution product "Field SBSITM / Screen ITS [ITS]" VS Alternate product "Field RPLITM / Screen ITM2 [ITM2]" in "Product"

    Hello All, Can someone explain the reason for these two fields listed in the subject in "Products" screen. I've read the basic break down's from "F1" help, but we are looking for more real world examples and purposes of these two fields. Could either…
  • Manufactured product - Q status as default single item

    How do you have a single product be put in Q status as soon as a case / pallet is made in production? I can see how to do it by "product category" but i only want a single item within that category. Sage X3
  • Web scheduling work orders problems

    The problem is that while importing plant from sage x3 it goes well, the file *.JSON contain all the information from sage x3, but when I opened web scheduling I can't run automatic scheduler (due to inexistence of work orders as show below)
  • Changing the FIFO dates in X3. Manually.

    Currently when product is received into X3 to any location it is tagged with a receipt date. This is the date that travels with the product and drives the FIFO order for each product. Is there a way to manually FIFO inventory to give more versatility…
  • Payment Voucher Print

    Hi All, I am facing this issue very often as I was unable to click 'Record' to print Payment voucher for one of the payment entry type and sometimes, with few transactions under this payment type as well. I am using V11 of Sage X3. I tried to set…
  • Routing Operation - Formula

    Hello All, We are trying to get away from a predefined STK-OPE conversion within our Routings. I would instead like to use a formula that pulls the needed number from ITMMASTER automatically. I know I need to bring in something like [F:ITM] and grab…
  • BOM Component Valuation

    I have a production BOM where I have the same component listed three times. 1. amount of "goop" that is needed to fill the containers for the finished good 2. amount of "extra goop" that is needed to prime the tooling 3. the same "extra goop" to…
  • Routes with long operation times set up

    Most of our routes are set up to track minutes, but when i tried to add a non-cost operation to my route where a product will wait for 7 days, the number format gave me an error. I don't want to have to switch the tracking from minutes to hours to have…
  • WIP unbalanced journal

    Hi, on Sage X3 v11, we are getting an error when posting the WIP of unbalanced journal all the accounting codes are setup correctly. we've even put a default GL account on the chart of accounts to post to that account in case we've missed any important…
  • Work center resources

    If my work center is set up as a machine, is the # of resources the: # of machines or the number of people to run the machine ?
  • Detail Scheduling Products with similar components

    Is there a way to set up my production boms or routes in a way that indicates that a group of them is of a similar product and should be detail scheduled together to reduce set up time ?
  • RCCP in X3

    Does anyone have a blurb or training guide on RCCP and it's relationship to WO scheduling in X3 ?
  • What is a business use case for Phantom products and Phantom product boms?

    I have not been able to find a lot of training on this topic. The documentation makes mention of it, but I'm curious what "real world" uses there are for phantom products, and boms that are associated to phantom products.
  • Manufacturing: machine set up optimizing

    Hello, everyone! We are facing an issue during the production scheduler implementation. The customer uses products characteristics to optimize the set-up time. Let’s say it is 5 hours long for a complete machine set-up, then to change from a product…
  • Keeping track of carts carrying product used in manufacturing

    My products when being produced are placed on a cart and that travels with them as they go work center to work center. we have a finite number of carts How do I allocate or declare the usage of the carts to a work order, but not "consume" them when…
  • Assembly Manufacturing

    We would to setup a client that does assemblies to use manufacturing functions like work orders orders and routings at the same having the ability to dissamble any of the parts at a latter time if the customer returns the product for warranty servicing…
  • Work Center Utilization and Status?

    Hi there, I'm using X3 v.9. I was wondering if there was a feature or a modification where a work center can be put into a certain status.... like "repair" or "conversion"? So that we can track how much the station is being used. Thanks!
  • How do I fix SEI connection issues?

    FormerMember
    FormerMember
    Users from one of are remote company locations can get to the https login page via the WAN and enter their AD credentials. Once the credentials are provided SEI never moves past the connecting screen. We are using AD authentication and the users who are…