• What module would be best for new services?

    We currently use all the core modules (GL, AP, AR, BR, PR, IM, PO, plus Job Cost and Time Card. I am looking for something, for example - we may have 1-3 jobs at a time (up to 90 days each), each job will have 2-3 work tickets, and each work ticket generates…
  • Work Order Traveler Printing Permissions

    I have a role that only prints blank work orders when ever WOT printing is processed. Header detail of the crystal report appears but all fields and details are blank. Im holding the Role Maintenance of a working role side by side with the non-working…
  • Can't Add New Product Codes in Item Maintenance

    When we enter a new item code into "Item Maintenance," it used to create a new product in the system. However now when we enter a new product code, everything goes blank, but it says "NEW" right by the Description (as it would do before). Everything else…
  • Work Order creating additional steps such as 100-B-500 etc.

    Good morning. I have created some routings which have 5 key steps to them for 5 key phases of manufacture to improve visibility. I have made these steps standardized across routings. The step numbers are set off by 100s so there is a step 0100, 0200…
  • Mix Issue Methods - Manual and Backflush

    Hi there, Does anybody know if it's possible to mix issue methods in Work Orders? We have some Bills of Materials which are quite lengthy with expensive, lot/serial controlled components that we need to manually allocate. Mixed into the BoMs are a bunch…
  • Is there any down side to allowing entry of negative quantities on BOMs? Will Work Order Entry recognize the negative quantity?

    We have several BOMs with Options that require removing one item and adding another when a specific option is selected. Without this checkbox checked to allow negative quantities, we have to use Option Interactions which can get very confusing. I would…
  • Outside Processing onto Work Orders

    FormerMember
    FormerMember
    Hi everyone, We are having an issue making a connection between an outside processing PO and the work order.This is what we are currently doing: (1) Make a sales order for part Y (which is part X plus an outside vendor processing step (i.e. painting…
  • User Limit exceeded (no topic in base Knowledge)

    Hello We just Update from sage 2013 to a 2016 Version, But now I am getting a message " User Limit exceeded" I did try the base knowledge but I could not fine any topic about this message. If you have any suggestion please let me know Thank you…
  • MAS 90 WO are my new assignment. I'm looking for a good tut to get started on this.

    I have one week of training on Sales order entry and BOM. Now my boss is pushing me to get the work orders up and running. I'd like to find a good tutorial, or some resources. Where do I start? Is there any hope for me? I've checked on youtube. There…