• How to auto update all BOMs after Replace and Delete Component Entry or revision change of subassembly part

    My company has a policy where if the revision of an individual part or subassembly changes (like a cable changing from Revision B to C), the top-level assembly revision must also change (like 000 to 001). Since many top-level assemblies may use the…
  • What module would be best for new services?

    We currently use all the core modules (GL, AP, AR, BR, PR, IM, PO, plus Job Cost and Time Card. I am looking for something, for example - we may have 1-3 jobs at a time (up to 90 days each), each job will have 2-3 work tickets, and each work ticket generates…
  • Can't Add New Product Codes in Item Maintenance

    When we enter a new item code into "Item Maintenance," it used to create a new product in the system. However now when we enter a new product code, everything goes blank, but it says "NEW" right by the Description (as it would do before). Everything else…
  • User Limit exceeded (no topic in base Knowledge)

    Hello We just Update from sage 2013 to a 2016 Version, But now I am getting a message " User Limit exceeded" I did try the base knowledge but I could not fine any topic about this message. If you have any suggestion please let me know Thank you…
  • Engineering Changes and active work orders

    I am new to this system so please be patient with me. I have a question in regard to engineering changes that will effect active work orders. Currently when a BOM needs to be changed, the current procedure is to delete the current planed work order…
  • MAS 90 WO are my new assignment. I'm looking for a good tut to get started on this.

    I have one week of training on Sales order entry and BOM. Now my boss is pushing me to get the work orders up and running. I'd like to find a good tutorial, or some resources. Where do I start? Is there any hope for me? I've checked on youtube. There…
  • Direct Labor Costs Built into Bill of Materials for Items Sold as a Kit (always explode)

    We have a packaging company with a large variety of items which are packed to order. As we don’t prepack, virtually all our sales are through kits with the option selected to “always explode”. We do have a bill of materials (BOM) for each kit as items…