Welcome to the Sage 100 Support Group on Community Hub! Available 24/7, the Forums are a great place to ask and answer product questions, as well as share tips and tricks with Sage peers, partners, and pros.
My company has a policy where if the revision of an individual part or subassembly changes (like a cable changing from Revision B to C), the top-level assembly revision must also change (like 000 to 001).
Since many top-level assemblies may use the…
In Item Code Maintenance where you set up the units of measure. What is "SALES" used for? Is it used for sales to an end user, or is it used for the recipes/bill of materials/costed bill sales?
The Bill of Material allows a parent item with components.
Is there a way to create a serial number for the Parent Item and then assign serial numbers for the components? Thanks!
We are on Sage 100c 2019 and I'm trying to find out a way, that when BOM Production Entry is launched and we go to the lines tab, that the line sequence is NOT alphabetical/numeric ascending (which appears to be the default), but based on the way the…
I don't have the work order/production module. What is the best way to incorporate labor rates into Sage 100 BOMs? Right now I'm set up using misc codes.
When we enter a new item code into "Item Maintenance," it used to create a new product in the system. However now when we enter a new product code, everything goes blank, but it says "NEW" right by the Description (as it would do before). Everything else…
Hi,
I'm trying to set up BOM and was wondering how some of you do it with international freight charges, Tariffs etc. Our freight charges change monthly. I would love step by step instructions.
Thanks,
We recently upgraded to have Bill of Materials so that we can issue inventory when we manufacture goods. An issue we're having is that Bill of Materials seems completely unsuited to companies who manufacture custom items to order. We manufacture items…
Hello
We just Update from sage 2013 to a 2016 Version, But now I am getting a message " User Limit exceeded" I did try the base knowledge but I could not fine any topic about this message.
If you have any suggestion please let me know
Thank you…
I am new to this system so please be patient with me.
I have a question in regard to engineering changes that will effect active work orders.
Currently when a BOM needs to be changed, the current procedure is to delete the current planed work order…
I have one week of training on Sales order entry and BOM. Now my boss is pushing me to get the work orders up and running. I'd like to find a good tutorial, or some resources. Where do I start? Is there any hope for me? I've checked on youtube. There…
We have a packaging company with a large variety of items which are packed to order. As we don’t prepack, virtually all our sales are through kits with the option selected to “always explode”. We do have a bill of materials (BOM) for each kit as items…
I have about 200 items from which I need to remove one component item and replace it with another.
Is there a way in which I can do this without having to go into BOM Maintenance for each of the 200 items and doing it manually?
I know I can add the…