• How to auto update all BOMs after Replace and Delete Component Entry or revision change of subassembly part

    My company has a policy where if the revision of an individual part or subassembly changes (like a cable changing from Revision B to C), the top-level assembly revision must also change (like 000 to 001). Since many top-level assemblies may use the…
  • Item Code Setup

    In Item Code Maintenance where you set up the units of measure. What is "SALES" used for? Is it used for sales to an end user, or is it used for the recipes/bill of materials/costed bill sales?
  • Bill of Materials - Parent & Component Serial Numbers

    The Bill of Material allows a parent item with components. Is there a way to create a serial number for the Parent Item and then assign serial numbers for the components? Thanks!
  • Match BOM Production Entry Line Sequence to BOM Maintenance detail line entry

    We are on Sage 100c 2019 and I'm trying to find out a way, that when BOM Production Entry is launched and we go to the lines tab, that the line sequence is NOT alphabetical/numeric ascending (which appears to be the default), but based on the way the…
  • I don't have the work order/production module. What is the best way to incorporate labor rates into Sage 100 BOMs?

    I don't have the work order/production module. What is the best way to incorporate labor rates into Sage 100 BOMs? Right now I'm set up using misc codes.
  • Can't Add New Product Codes in Item Maintenance

    When we enter a new item code into "Item Maintenance," it used to create a new product in the system. However now when we enter a new product code, everything goes blank, but it says "NEW" right by the Description (as it would do before). Everything else…
  • BOM, Creating Multi Level Bills

    Is there a quick handbook for putting together multi-level bills? Thanks! Dan
  • BOM

    Hi, I'm trying to set up BOM and was wondering how some of you do it with international freight charges, Tariffs etc. Our freight charges change monthly. I would love step by step instructions. Thanks,
  • Bill of Materials for Custom Made to Order Goods

    We recently upgraded to have Bill of Materials so that we can issue inventory when we manufacture goods. An issue we're having is that Bill of Materials seems completely unsuited to companies who manufacture custom items to order. We manufacture items…
  • User Limit exceeded (no topic in base Knowledge)

    Hello We just Update from sage 2013 to a 2016 Version, But now I am getting a message " User Limit exceeded" I did try the base knowledge but I could not fine any topic about this message. If you have any suggestion please let me know Thank you…
  • Engineering Changes and active work orders

    I am new to this system so please be patient with me. I have a question in regard to engineering changes that will effect active work orders. Currently when a BOM needs to be changed, the current procedure is to delete the current planed work order…
  • MAS 90 WO are my new assignment. I'm looking for a good tut to get started on this.

    I have one week of training on Sales order entry and BOM. Now my boss is pushing me to get the work orders up and running. I'd like to find a good tutorial, or some resources. Where do I start? Is there any hope for me? I've checked on youtube. There…
  • Direct Labor Costs Built into Bill of Materials for Items Sold as a Kit (always explode)

    We have a packaging company with a large variety of items which are packed to order. As we don’t prepack, virtually all our sales are through kits with the option selected to “always explode”. We do have a bill of materials (BOM) for each kit as items…
  • Changing Multiple Bill of Materials items at once / Sage100 ERP

    I have about 200 items from which I need to remove one component item and replace it with another. Is there a way in which I can do this without having to go into BOM Maintenance for each of the 200 items and doing it manually? I know I can add the…