• How to auto update all BOMs after Replace and Delete Component Entry or revision change of subassembly part

    My company has a policy where if the revision of an individual part or subassembly changes (like a cable changing from Revision B to C), the top-level assembly revision must also change (like 000 to 001). Since many top-level assemblies may use the…
  • Sales Kit Part Pricing (BOMs)

    I am looking to utilize sales kits to add and remove parts on sales orders. However I want the sales kit pricing to be a roll up of the part prices and not have to put a price on the sale kit parent part. Individual part prices can change and I don't…
  • I don't have the work order/production module. What is the best way to incorporate labor rates into Sage 100 BOMs?

    I don't have the work order/production module. What is the best way to incorporate labor rates into Sage 100 BOMs? Right now I'm set up using misc codes.
  • Alternate Bill Of Materials

    Hello, our company is new to Sage 100 and in the process of setting up Sage. My question is this, is there a way to setup alternate BOM's? The closest thing I can find are BOM "options" but according to Sage this should only be used at the top level assembly…
  • Can't Add New Product Codes in Item Maintenance

    When we enter a new item code into "Item Maintenance," it used to create a new product in the system. However now when we enter a new product code, everything goes blank, but it says "NEW" right by the Description (as it would do before). Everything else…
  • BOM, Creating Multi Level Bills

    Is there a quick handbook for putting together multi-level bills? Thanks! Dan
  • Is there any down side to allowing entry of negative quantities on BOMs? Will Work Order Entry recognize the negative quantity?

    We have several BOMs with Options that require removing one item and adding another when a specific option is selected. Without this checkbox checked to allow negative quantities, we have to use Option Interactions which can get very confusing. I would…
  • Sales order to purchase order BOM KIT's - Multilevel issue

    Hello. I hope all is well. We have multilevel BOM's defined as a KIT type in the BOM system. We wanted the ability to create a sales order for a manufactured item that consists of several levels of BOM's. The reason we went with the kit type is that…
  • Work Ticket Item Explode Issue

    Hi, I was wondering if there is a feature that allows us to see an exploded item with in a work ticket? Essentially I have an item that has its own BOM and is a item on a work ticket. I want to be able to see the components of that item on the work ticket…
  • User Limit exceeded (no topic in base Knowledge)

    Hello We just Update from sage 2013 to a 2016 Version, But now I am getting a message " User Limit exceeded" I did try the base knowledge but I could not fine any topic about this message. If you have any suggestion please let me know Thank you…
  • Engineering Changes and active work orders

    I am new to this system so please be patient with me. I have a question in regard to engineering changes that will effect active work orders. Currently when a BOM needs to be changed, the current procedure is to delete the current planed work order…
  • MAS 90 WO are my new assignment. I'm looking for a good tut to get started on this.

    I have one week of training on Sales order entry and BOM. Now my boss is pushing me to get the work orders up and running. I'd like to find a good tutorial, or some resources. Where do I start? Is there any hope for me? I've checked on youtube. There…
  • Direct Labor Costs Built into Bill of Materials for Items Sold as a Kit (always explode)

    We have a packaging company with a large variety of items which are packed to order. As we don’t prepack, virtually all our sales are through kits with the option selected to “always explode”. We do have a bill of materials (BOM) for each kit as items…