• Dimension Codes Not Flowing From Supplier Record to Supplier Invoice

    Common Data >> Bps >> Supplier, Financial Tab, Analytical Dimensions Currently only codes listed in AX1 flow through to the supplier invoice (Supplier BP invoices). How do I change the other dimensions to flow through to the supplier invoice as…
  • Changing the FIFO dates in X3. Manually.

    Currently when product is received into X3 to any location it is tagged with a receipt date. This is the date that travels with the product and drives the FIFO order for each product. Is there a way to manually FIFO inventory to give more versatility…
  • Payment Voucher Print

    Hi All, I am facing this issue very often as I was unable to click 'Record' to print Payment voucher for one of the payment entry type and sometimes, with few transactions under this payment type as well. I am using V11 of Sage X3. I tried to set…
  • Format of BP Site tax ID - help

    This is the set up for France in my X3. Please help guide me on an example of how the tax ID should be formatted for the CRN field in BPARTNER
  • AESPION - Setting up

    I saw the posts about the parameter setting that would turn on this table being populated, but my parameters say "no", yet I'm seeing user transactions populate in this table. Where are the settings that would prompt user transactions to populate in AESPION…
  • BOM Component Valuation

    I have a production BOM where I have the same component listed three times. 1. amount of "goop" that is needed to fill the containers for the finished good 2. amount of "extra goop" that is needed to prime the tooling 3. the same "extra goop" to…
  • Do MRP Replanning messages apply to WO that were manually created?

    I have a planned WO that was manually created on 6/3 that was manually created stock went below the safety stock limit on 5/15 my MRP replanning messages have a 120 backword and foreward lead time, and under "replan dates" it's set to "Early" …
  • MRP Settings - Load Calculation and Production Lead Time

    MRP Settings have the load calculation at 26 weeks. The production lead time is set to Routing/Product Lead time From what I can see in the load graphs, I only see load for 6 months. and from the MRP results, I can see that the routing is used for…
  • Demand Horizon and MRP

    Does anyone have a better definition of the demand horizon than what has been in the training material ? Also does anyone know what the affects of having the demand horizon set to 0 means for a manufactured good? Thank you!
  • Routes with long operation times set up

    Most of our routes are set up to track minutes, but when i tried to add a non-cost operation to my route where a product will wait for 7 days, the number format gave me an error. I don't want to have to switch the tracking from minutes to hours to have…
  • Stock Backflush and WO Closing

    Can someone provide more of a guidance to the backflushing feature when it occurs in work order closing? at what point does it trigger the new stock transaction to consume the "remaining" quantity of the components? outside of the product-site record…
  • Work center resources

    If my work center is set up as a machine, is the # of resources the: # of machines or the number of people to run the machine ?
  • Work Center Grouping checkbox

    Is this feature used to group work centers together (as if they were connected with a conveyor system) so that the scheduling tool doesn't replace one work center with another, and also keeps the schedule together (split the work order across a couple…
  • Detail Scheduling Products with similar components

    Is there a way to set up my production boms or routes in a way that indicates that a group of them is of a similar product and should be detail scheduled together to reduce set up time ?
  • Consequences of MRP Daily bucket set to 0

    Looking through the training material for MRP, most of the suggestions have the daily bucket set to 30. What are the consequences of having it set to 0 ?
  • RCCP in X3

    Does anyone have a blurb or training guide on RCCP and it's relationship to WO scheduling in X3 ?
  • MRP not suggesting to build to safety stock

    When I look farther out in my projected stock inquiry, the WOS suggestions do not seem to be suggesting to build the stock to safety stock, but just a reflection of the demand. What settings influence this behavior ? How can I ensure my stock level is…
  • Demand Horizon for "Purchased" Products

    In the product-site record there is a demand horizon. From my understanding, anything before that time MRP considers Firm SOs and anything after is Firm SOs and Forecast Demand. For me this makes sense for the products that are manufactured What…
  • WRH Activity code for Warehouses - Implementation Question

    After I turn on the WRH activity code, it allowed us to create a warehouse under our site. My question though, is do I have to create all new location numbers to be under that warehouse, or can I update the existing location numbers with a warehouse…
  • How do I fix SEI connection issues?

    FormerMember
    FormerMember
    Users from one of are remote company locations can get to the https login page via the WAN and enter their AD credentials. Once the credentials are provided SEI never moves past the connecting screen. We are using AD authentication and the users who are…