• Just released: Sage X3 v12.0 1099 2022

    Just released: Sage X3 v12.0 1099 2022. We're thrilled to let you know that the Sage X3 v12.0 1099 for 2022 is now available to download from the Sage Knowledgebase. Head to Knowledgebase article Download Sage X3 Version 12.0 1099 2022 to download…
  • MRP operation loads from suggested work roders

    Does X3 create operations for suggested work orders? I have the ROP set for MRP pegging and have the load calculation on for the requirements parameter but not seeing operations for suggested work orders. Routings are out there.
  • MRP date

    I have a process basically just using the ORDERS(WIP) table. When there is no value for MRP date, SEI shows '01-01-53'. How can I suppress that and still have a value when there is an MRP date? I've played with the calculation but no avail. Was trying…
  • How to Allocate stock/create shortage against intervention

    Hi Guys, V12 PU 25. Wondering if there is a way to manage the following scenario involving service interventions. When creating an intervention typically we need to specify the parts required for the job. We can do this under the consumption…
  • Suggested trasnfer order showing red highlight and cant be selected on the Grouping workbench

    We ran MRP and got some warehouse transfer suggestions On mlost products it is working fine but on a few products we are having the issue below When we go to grouping workbench for suggested warehouse (intersite) transfers the line whos with red highlight…
  • EOQ and Technical lot

    We're trying to get MRP to do WOS's in increments using the EOQ and Technical lot. Here's the situation. Say the build needs to be 9,123 to get to ideal inventory position. What we're trying to get is 2 WOS's of 4,000 each and 1 WOS of 2,000 which would…
  • MRP Available stock vs By order

    Internal constraints don't allow us to have a WOF of more than 5,000. If we have a SOF for 15,000 and 3 WOF's for 5,000 each, replanning wants us to increase the first WOF to 15,000 and cancel the other two WOF's in the same time bucket. Is there a way…
  • Stock location or status not nettable for MRP

    We have a requirement to have some items in stock but not show as available for MRP. I looked for a flag on the location or location type to say not for MRP, but can't seem to find anything. We want MRP to see Quality stock including status R since…
  • Anyone else interested in a separate MRP/Planning forum?

    Might be good to have something very specific for manufacturing and distribution. Sage 500 had that and it was really good.
  • How to inform MRP of regular receipts

    We have a process similar to a bottle return, where we regularly receive 60/widgets back from customers a week. How can I inform MRP of these POSs? Forecasts show planned deductions, how do i show planned receipts without creating POP/POF?
  • Does MRP pegging only do suggested materials and not loads?

    Still a newbie here....
  • How does MRP determine Suggested Work Order Start date

    Can someone shed some light on how MRP calculates the suggested work order start date. We have a demand forecast for quantity 1 in week 4 of Feb When we run enterprise planning it shows that the requirement date based on the demand forecast…
  • Statistical Re-Ordering - ACODNUM ERROR

    Getting the above error message when running statistical re-ordering function. All the sequence seem to be in place. Thanks to advise.
  • MRP Processing Error in Log Reading

    "Product Master missing for this Product-Site" This error has started appearing, and I cannot figure out what the underlying issue is. It always happens after Phase 4, and is only for this specific site. I have ran all kinds of SQL scripts to see if…
  • Safety stock lead time in MRP

    I have an issue with MRP processing that I think should be easy but it not. If I have a product that has a safety stock set at 20 and I have 20 in stock and get a sales order to use 10 and allocate those. MRP sees that it needs to reorder safety stock…