I recently created a Sage 100 version 2013 test server and did a parallel migration from our production Sage 100 version 4.40 data.
Sage support helped me out with an error I was getting at the very end of the migration and that fixed that problem.…
Parallel migrating data from Sage 100 ERP Advanced version 4.40 to Sage100 ERP Advanced version 2013...
After several hours I get this error message: Finalize failed with the following error:
and the rest of the window is blank...no error or anything…
I am setting up a test Sage 100 ERP Advanced 2013 server and when I try to convert the modules it wants to upload the credit cards to the Sage Vault.
Will doing this in any way affect our current production Version 4.40 installation?
If so, can I…
We just upgraded to Sage 100 ERP from Mas 200 and I got this error this morning. I'm not familiar with it. I've looked through a few areas for help, but haven't found any solution thus far. I'm hopeful that someone has run across this issue before.