• Contractor rates on Time Slip by Project Summary

    Please make it possible to enter the rate for a contractor in the Vendor information so that it can be used to produce the cost for a contractor on a project using the Time Slip by Project Summary report. Right now we have to set up a contractor as a…
  • Modifying Projects Report

    Is it possible to modify the Projects reports so that the Total of each project is in a separate column to the right of the detail ? I want to be able to get a total of all the totals.