• 6-12 - Project Work Center - Any way to copy custom menu from one machine/user to another? Or can a custom menu be made the default for all users?

    Hello, we're working on Sage 100 Contractor version 25.1.330.0. Is there any way to copy a custom Project Work Center menu from one device/user to another or to make the custom menu the default for all users?
  • Custom fields PIN button missing

    When trying to Pin a custom field page to the 3-5 screen, the 'Pin' button is missing. The user is signed in as an administrator. Other users within their company have the Pin button available. Why would a particular user not have access to the Pin button…
  • Key stroke customization - using TAB instead of ENTER

    Can I customize workstations for user's preferences? Specifically, can I set up a workstation so that the TAB key is the key that moves through a data screen and saves the information? Currently, all of our workstations use the ENTER key.
  • Sage 100 Contractor Canada Report Modifications

    We have purchased Sage 100 Contractor - Canada about a year ago. it was an upgrade from Sage 50. we had great support setting up Sage 100 and transferring our account information from Sage 50. the person used for this has since retired and we are…
  • Custom Report Questions

    Hello Everyone! On report 6-1-4-31 Job Cost Summary ~ Long, there is not a 'Modify Report' button. I believe it is because when it was created, information was taken from multiple 'tables' and the reports that are editable in Sage 100 Contractor seem…
  • Page setup - HomePage

    My pages are getting cutoff on the right side - Cant find the settings to fix it. Also my menu on the left side disappeared upon opening Sage. Help please!
  • Sage Estimating Report Layout Modification

    Hi, Is there a way to modify the layout of a report? I'm trying to print a "Bill of Quantities" report, but the data within the columns are getting truncated.
  • Sorting / moving estimate line item

    Hi, Is there a way or method to sort / move an estimate line item in the order which I want to? The estimate is sequenced to group the estimate under Bid Item. I want to move line number 14 to line 13 and vice versa.
  • Sort Vendor by Payment Type

    How do I go about generating a list of vendors sorted by their payment type? I want to know which vendors I pay are paid by EFT, Cheque, etc.
  • Create a Preset Range in Print Selection

    For one of my reports, we have several jobs that are old but are still included on this custom report we have. Instead of picking each job individually that is active in the Print Selection under Range, I was hoping to create a present range so when I…
  • Import Commitment

    Hi Does anyone use the import commitments tool in Job Cost? I’m looking for a template to bring subcontracts from excel
  • How do I add the Controller Dashboard?

    I replaced my computer and now my Sage Dashboards are gone. Where do I find the crystal reports to link to when I select "Add a selected Crystal Report" in the dropdown?
  • Sage 100 Contractor - Certified Payroll Report

    How do I add a permanent name and title and signature to the Payroll report template? I've seen others have it generate automatically.
  • barcoding

    Does Sage 300 provide a barcode system or inventory management system that works with Sage products? When we first took on Sage (It was Timberline back then) they did not provide a warehouse management system. Has that changed in the last twenty-five…
  • automate job and contract creation

    We are looking for someone who can help us with automation of data entry. We use salesforce for bidding and estimating. Because creating a job or contract is not available via Sage's API, our goal is to pull a report from SF and have an RPA bot or MS…
  • Report Designer

    Good morning, I'm trying to edit a report in report designer that's already in Sage 300, Job Cost module (Committed Cost Status report). I'm wanting to add a totals line per job when running the report for multiple jobs. Does anyone have the knowledge…
  • G703 Customization

    Has anyone custimized their G703 to include a column for "net amount due this period"? Thank you, Tina
  • SAGE 300 BILLING

    looking for away for when it comes time to bill. How do you have PM's mark up billing so you know what to bill, instead of just printing drafts.
  • Create an Indirect Cost to Budget Variance Report

    Hello! I'm new to Sage City. I am very happy to have joined and I look forward to learning how to get the most out of the Sage 100 Contractor. I am trying to create a report based on 2-3-33, where it allows me to choose the accounts, and shows the…
  • I can print part barcodes, but how do we scan them?

    Is there a method in Sage 100 Contractor to scan a part number barcode to receive and track inventory?
  • 3-10 T&M invoices

    How do I put a description of work on a T&M invoice?? I cannot fathom Sage would have created a invoicing system without the ability to insert a description of work. Not sure anyone would pay a T&M invoice without one? 3-10 Sage 100 Contractor
  • AIA G702-1992

    The AIA draw form currently we use in Sage is fine as we are a contractor. However we are now a GC in many projects and I need the AIA G702 - 1992 with the Architect approval section. It's a totally different form. Is there a way to get that form into…
  • Comparative Income Statement showing huge percentage variance because prior period amount is negative .06. shouldn't that round to zero before making calculations?

    the current amount is 1,470.87 the prior period amount is -.06 so my percentage variance is showing as 2,411,550 which is crazy. it should just be zero because the prior period amount column is showing a zero. Not sure how to fix this? I'm way too…
  • Sage 100 and Buildertrend

    We are a home builder using Sage 100 for our accounting. Does anyone use Buildertrend for their construction management software? If so, how do you import / export information between the two? Thank you,
  • Payroll entry

    How do you hide the columns you don't use permanently?