I am on v6.5 and trying to write a simple Crystal report linking a WO and its required components that are on a PO. My issue is I cannot find the "link" between the WO and the PO. I have used the assignments workbench to link and to force allocate the PO to the WO. I have studied the ORDERS table. My PO is there and my WO is there. BUT I cannot find a link between the two (as the WIPNUM is different). X3 must be writing something to a table somewhere as the assignment workbench screen shows the link between the two on the screen. Thanks for your help.