Equiment Cost Module. We are collecting the cost for the EQ in AP, JC and PR for each EQ at the end of the month we have all of our cost entered and posted to a EQ cost code, and we do have an EQ timesheet where we have the hours that the EQ has worked for each Job site cost code Does timberline have the capabilities to distributed the EQ Cost allocated under the EQ Cost code thru the Job site cost codes base on the hours?