Changing Multiple Bill of Materials items at once / Sage100 ERP

I have about 200 items from which I need to remove one component item and replace it with another.

Is there a way in which I can do this without having to go into BOM Maintenance for each of the 200 items and doing it manually?

I know I can add the additional material via Visual Integrator, but how can I remove the existing one? Or, is there an easier way?

I am on Sage100 ERP 2014 Advanced (V. 5.10.3.0)